04 / THE WORKING SEQUENCE
THE SITE
COMES FIRST.
Three stages to explore.
Scroll through the sequence.

01
BEFORE THE FIRST MACHINE
READ
THE SITE.
The entrance, the levels, the ground beneath them. Start with the constraints that will govern the work.
- LOOK FOR
- Access, utilities, adjacent structures
- BRING TO THE TABLE
- Site survey, ground investigation, existing records

02
FROM CONSTRAINT TO PROGRAMME
BUILD THE
SEQUENCE.
Choose the working order before the site fills up. Haul routes, material storage and crane positions compete for the same space.
- COORDINATE
- Work zones, deliveries and live operations
- AGREE BEFORE MOBILISING
- Hold points, access windows and trade interfaces

03
MAKE THE NEXT PHASE POSSIBLE
HAND
OVER.
The next trade needs more than an empty work zone. Confirm levels, service locations and what remains outstanding.
- CHECK TOGETHER
- Finished formation, safe access, completed services
- LEAVE A RECORD
- As-built information, inspections and open items
BUILD A SCOPE BRIEF ↗